You can use your smart phone to browse stories in the comfort of your hand. Simply browse this site on your smart phone.

    Using an RSS Reader you can access most recent stories and other feeds posted on this network.

    SNetwork Recent Stories

Arianne Phosphate Partners with the Province of New Brunswick for Further Review of a Phosphoric Acid Plant

by pmnationtalk on August 9, 201839 Views

August 09, 2018

Arianne to proceed to a prefeasibility study; receives support and a financial contribution

SAGUENAY, QUEBEC – (August 9, 2018) – Arianne Phosphate (the “Company” or “Arianne”) (TSX VENTURE: DAN; OTC: DRRSF; FRANKFURT: JE9N), a development-stage phosphate mining company, advancing the Lac à Paul project in Quebec’s Saguenay-Lac-Saint-Jean region, today is pleased to announce that it has partnered with the Province of New Brunswick to further its review of constructing a phosphoric acid plant in Belledune, New Brunswick.  As part of this agreement, the Government, through Opportunities New Brunswick (“ONB”), will provide a financial contribution toward the cost of a prefeasibility study, the next step in Arianne’s assessment of its downstream opportunity.

“Over the last year, Arianne has been reviewing the possibility of vertically integrating its own phosphate rock production into a facility to produce phosphoric acid,” said Brian Ostroff, CEO of Arianne Phosphate.  “Our work to date has been positive and, especially with the industry now recovering from a five-year slump, it makes sense to move the idea to the next step, a prefeasibility study.  We are in an enviable position. By having our own phosphate rock, we have the flexibility of either being a seller of our rock to those who need it or, going downstream and capturing that additional margin ourselves.”

After the review of several locations Arianne believes that Belledune, New Brunswick would be a strong location to construct a plant.  Most of the crucial infrastructure is already in place, namely a port that has the additional capacity to handle our operation, access to a skilled labour force, easy-access to some of the other necessary ingredients beyond Arianne’s phosphate rock and, a strong willingness of would-be stakeholders to see this project advance.

“We want to thank all involved up to this point,” said Jean-Sebastien David, Arianne Phosphate’s COO.  “The support from the Government of New Brunswick and Opportunities New Brunswick has been tremendous and has definitely helped steer us in the direction of Belledune.  We appreciate their commitment to helping us fully review the possibility and, their contribution towards the prefeasibility study, which will be a deciding factor in our ultimate decision to proceed.”

Arianne has already been working with the various groups that will be involved in the study, many of them local to New Brunswick.  Once finalized, the prefeasibility study is expected to take roughly five months and will give the Company and the Province a good look at the opportunity.  The results of the study will help isolate next steps.

About Arianne Phosphate
Arianne Phosphate (“Arianne Phosphate Inc.”) (www.arianne-inc.com) is developing the Lac à Paul phosphate deposits located approximately 200 km north of the Saguenay/Lac St. Jean area of Quebec, Canada. These deposits will produce a high quality igneous apatite concentrate grading 39% P2O5 with little or no contaminants (Feasibility Study released in 2013). The Company has 103,570,610 million shares outstanding.

– 30 –

Contact Information:
Source: Jean-Sébastien David, C.O.O. Tel. : 418-549-7316 j.s.david@arianne-inc.com
Info:  Brian Ostroff, C.E.O. Tel. : 514-908-4202 brian.ostroff@arianne-inc.com

NT4

Send To Friend Email Print Story

Comments are closed.

NationTalk Partners & Sponsors Learn More